11.23.2010

8th square

It is a bell and ribbing square. It took me 4 days to knit this. :)

11.17.2010

A 7th square

I just finished 7th square today. It is Acrons knitting, actually it is "Y" if you are really looking at this very close then you will know what I mean. Yeah, it is looks like "X" or "diamonds" but it isn't.

11.15.2010

Soil

They put a new soil and rocks in the hole of our driveway. After two weeks, they will come again to put a new cement on it. Yes, sometimes life are sucks. But I am little relief that my pipe is all better now. I found out that another houses around us had the same problems as we had one recently. It is just water pressure. So I am little whew that we are not alone that who had a water problem. About 4 to 5 houses here had water problems. When it's happen, then happened. Living in a houseowner ISN'T easy job! But worth it. Like Jesus Christ said "I never said it would be easy, I only said it would be worth it" We (my dad, Derek's dad, and us) will work out with the bill to pay with this. So it is little relief now. Derek's Uncle Lloyd Facer brought the gravel to our driveway to reduce the price. Isn't that nice of him?

A pipe fixed! Hooray!

It is on our driveway. Pipe was broke. Lee's Plumber came and fixed. About time! It has been leaking for one and half months now. Copper had been cracked. We don't know how what to caused the copper to crack. Wyatt loves to watch a bulldozer. He heard it, ran onto the couch and watching outside front window. You can see a new white light blue pipe there. They had to break a wall of well and hooked up a new pipe there. We can't park our truck on that side for two weeks, because it needs to be pressure little bit down and see if a pipe can sit all right. Then we can parking our truck.

11.14.2010

A sixth square

It is a wrap cable. I used red heart hunter green. I love the color hunter green. It made me feel like want a place of heavy snow, snug in warm and thick blanket, sit by a fireplace and some of hot cocoa. Mmm, heaven. I am winter person. I hate summer.

11.11.2010

A 5th squares

Finally, I decided to go back and working on my afghan for Wyatt. This is a fifth squares I had been worked. It is a cable knit. There are 7 squares left to go. My projects are little bit slowing down now, because there are a few of my projects that are large projects. It take me forever to get them done. They are NOT YET finish that which drive me nut right now. I really want to go ahead and start a new project, but I can't. I need to get my large projects to finish first. I still have afghan, stole, blanket for Emma, and Hoodini to be done. All of them are knitting. I finally finished my crochet projects and I am focusing on my knitting projects.